Note 30939

Geyser:Corporal
Date/Time:1985-07-03 @ 1200
Entrant:research-mab
Observer:1985 Norris log
Time Entered:2023-11-23 06:40:40
Time Uploaded:2023-11-23 06:40:40
Submitted to:Geysertimes.org
Note:July 3 1985 – no time noted - Dog Leg 197ºF boiling continuously & overflowing into Corporal Corporal Geyser – 146ºF also overflowing loaded with rocks near the vent and also some along the rim. Removed as many as possible – still many large rocks near the vent. - Trail is wet along & below Corporal runoff

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.