Note 25500

Geyser:Steamboat
Date/Time From:2023-05-17 @ 1612
Date/Time To:2023-05-17 @ 1653
Entrant:bbev
Observer:
Time Entered:2023-05-17 16:53:08
Time Updated:2023-05-18 20:00:42
Time Uploaded:2023-05-18 20:36:03
Submitted to:GeyserTimes for Android
Note:both vents active with angled play. SV runoff channel wet with occasional gravel rolling runoff. NV hit 25' on several occasions. CS overflowing heavily in all directions, water level well over the edges of entire pool. Trough completely full of gravel, with water running out the south side rather than directly under bridge. Crazy erosion in NV channel, with gravel nearly refilling the channel at that bridge.

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.