Geyser: | Ledge |
Date/Time From: | 2015-09-04 @ 1000 |
Date/Time To: | 2015-09-04 @ 1725 |
Entrant: | MAB |
Observer: | MA & DaveM, morning; MA evening |
Time Entered: | 2015-09-04 20:25:49 |
Time Uploaded: | 2015-09-04 20:25:49 |
Submitted to: | Geysertimes.org |
Note: | DaveM and I checked Ledge on Day Four. Dry. The Pit was lower at 1720 than it was at 1000, just two connected 18" circles that look like large sunglasses. Jetsam's shoulder vents were active, and Black Growler was moist and putting out a little water, but not much. The wettest White Vent was all day was after a soaking thunderstorm. In short, it's not ready yet. |