Geyser: | Steamboat |
Date/Time From: | 2020-08-23 @ 1700 |
Date/Time To: | 2020-08-23 @ 1715 |
Entrant: | cb |
Observer: | cb |
Time Entered: | 2020-08-23 18:59:57 |
Time Uploaded: | 2020-08-24 08:18:31 |
Submitted to: | GeyserTimes for Android |
Note: | SB platform is still dry as a bone! Some very weak angled play from both vents. SV - 5', NV - 8'. No water in SV runoff channel at all. Cistern Spring is in overflow with a mediocre boil. 1815 walked by again and SV has 5' thin trail of water/dampness that is just starting to extend down from the vent. Back Shoulder, back channel, Jabba all bone dry. |
Time Entered:2020-08-24 12:02:25
Time Uploaded:2020-08-24 12:02:25
Submitted to:Geysertimes.org