Note 14641

Geyser:Steamboat
Date/Time:2020-06-14 @ 1900
Entrant:cb
Observer:cb
Time Entered:2020-06-14 19:15:08
Time Updated:2020-06-14 19:30:12
Time Uploaded:2020-06-14 19:36:10
Submitted to:GeyserTimes for Android
Note:1D 20.5H post eruptive. SB platform is dry as a bone! ET, Jabba, the Dip are all dry. Both vents are just steaming; no huffing sounds at all. Cistern Spring is in overflow, the pool is high (water level is just covering the scalloped edges.) It is a milky, opalescent blue and has a very weak boil. At the trough, debris from the last eruption has been pushed into the channel directly in front of the foot bridge and the standing water is clear.

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.