Geyser: | Steamboat |
Date/Time: | 2020-06-14 @ 1900 |
Entrant: | cb |
Observer: | cb |
Time Entered: | 2020-06-14 19:15:08 |
Time Updated: | 2020-06-14 19:30:12 |
Time Uploaded: | 2020-06-14 19:36:10 |
Submitted to: | GeyserTimes for Android |
Note: | 1D 20.5H post eruptive. SB platform is dry as a bone! ET, Jabba, the Dip are all dry. Both vents are just steaming; no huffing sounds at all. Cistern Spring is in overflow, the pool is high (water level is just covering the scalloped edges.) It is a milky, opalescent blue and has a very weak boil. At the trough, debris from the last eruption has been pushed into the channel directly in front of the foot bridge and the standing water is clear. |