Geyser: | Ledge |
Date/Time: | 2019-09-18 @ 1600 |
Entrant: | bbev |
Observer: | |
Time Entered: | 2019-09-18 16:25:33 |
Time Uploaded: | 2019-09-18 16:25:34 |
Submitted to: | GeyserTimes for Android |
Note: | Ellen's video clearly shows red vent jetting water 50+'. 1600: forceful steam from valve and red vents. runoff channels are all wet. Jetsum pool is 2' below overflow, and palm pressure pool is 6-8" below overflow. |