Note 13013

Geyser:Steamboat
Date/Time:2019-08-04 @ 0715
Entrant:cb
Observer:cb
Time Entered:2019-08-04 07:34:16
Time Updated:2019-08-04 08:11:40
Time Uploaded:2019-08-04 08:47:23
Submitted to:GeyserTimes for Android
Note:5D 0H post eruptive. SB is huffing billows of steam this morning. Some grumbing with faintly audible gurgling water sounds deep in the system. No water in either vent and channels are bone dry. CS is ~2' below overflow and has a vigorous boil that is churning the pool. ** @ 805 walking back i stopped to take another peek at SB and the SV runoff channel now has thin strip of moisture with some pooling to the dead trees. sv runoff channel at the bridge is still dry. No water jetting from either vent observed. Shoulder dry.

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.