Geyser: | Ledge |
Date/Time From: | 2019-05-15 @ 0950 |
Date/Time To: | 2019-05-15 @ 1405 |
Entrant: | cb |
Observer: | Carol Beverly |
Time Entered: | 2019-05-15 10:48:12 |
Time Updated: | 2019-05-15 14:32:48 |
Time Uploaded: | 2019-05-15 14:50:14 |
Submitted to: | GeyserTimes for Android |
Note: | Ledge is alternating between semi quiet state to hissing mixed water/steam phase. The water in this mixed steam/water phase is a thin veil of water that is 4' - 8' high mixed in with the hissing steam. The runoff channel is wet with some pooling in the flats. Palm Pressure Pool is very low - down 4 - 5'. Jetsum pool is high and almost overflowing through the channel on the SE end. There is a hole between the Palm Pressure pool and Valve vent that I've not noticed before. |