Note 11245

Geyser:Ledge
Date/Time From:2019-05-15 @ 0950
Date/Time To:2019-05-15 @ 1405
Entrant:cb
Observer:Carol Beverly
Time Entered:2019-05-15 10:48:12
Time Updated:2019-05-15 14:32:48
Time Uploaded:2019-05-15 14:50:14
Submitted to:GeyserTimes for Android
Note:Ledge is alternating between semi quiet state to hissing mixed water/steam phase. The water in this mixed steam/water phase is a thin veil of water that is 4' - 8' high mixed in with the hissing steam. The runoff channel is wet with some pooling in the flats. Palm Pressure Pool is very low - down 4 - 5'. Jetsum pool is high and almost overflowing through the channel on the SE end. There is a hole between the Palm Pressure pool and Valve vent that I've not noticed before.

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.