Geyser: | Steamboat |
Date/Time From: | 2019-05-01 @ 0930 |
Date/Time To: | 2019-05-01 @ 1235 |
Entrant: | cb |
Observer: | Carol Beverly |
Time Entered: | 2019-05-01 16:20:50 |
Time Uploaded: | 2019-05-01 16:20:51 |
Submitted to: | GeyserTimes for Android |
Note: | From steerage: the Trough is dredged to bedrock right under the run off channel. quarter size and bigger debris collected just in front of the bridge. It looks like SB had some nice minor activity overnight as the run off channel had running water with ice formations all the way on the left side. Impressive run off at Steerage all morning. Nice concerted minors with impressive SV runoff but most of the play is SV dominated. 2 NV vertical play at 1104 & 1140. We will stop on our way home tonight. more later. |