Date: | 2014-08-24 |
Time: | 0825 |
Geyser: | Fan and Mortar |
Webcam: | No |
Initial: | No |
Major/Minor: | N/A |
Duration: | 34m |
Standardized Duration: | 34m |
Time Entered: | 2014-08-24 08:35:59 |
Time Updated: | 2014-08-28 10:24:29 |
Time Uploaded: | 2019-05-13 21:44:16 |
Entrant: | RLJones |
Observer: | |
Submitted to: | GeyserTimes for Android |
Comments: | See Event Cycle for preceeding details. Eruption initiated by Motar Upper in last few seconds of 0825. The surge was to about 15 ft then immediately climed to 60-80ft. Fan joined in within 3-5 seconds. East vent joined in around 3m into eruption and landed on middle of boardwalk but never over boardwalk. There was never any water in Main until the eruption. The inital shut down was at 0841. Restarts of Fan occured at 0842, 0846, 0849, one more time not recorded. Last water from Fan was 0900. Motar never restarted. Norris Pool rose during the eruption. |
WillBoekel | Time Entered:2014-08-24 11:05:34 Time Uploaded:2014-08-24 11:05:40 Submitted to:GeyserTimes for Android |
Time Entered:2014-08-24 17:36:46
Time Updated:2014-08-25 01:07:47
Time Uploaded:2014-08-25 01:07:47
Submitted to:GeyserTimes for Android