Date: | 2021-09-18 |
Time: | 1251 |
Geyser: | Fan and Mortar |
Webcam: | No |
Initial: | No |
Major/Minor: | N/A |
Duration: | 37m |
Standardized Duration: | 37m |
Time Entered: | 2021-09-18 13:01:09 |
Time Updated: | 2021-12-07 20:00:08 |
Time Uploaded: | 2021-12-07 20:00:10 |
Entrant: | Graham |
Observer: | BrianG, BenVL, DanA, CB, ToddS, Art & Larissa, ChrisG, MikeC, MJ Link (first eruption) and I |
Submitted to: | GeyserTimes for Android |
Comments: | First pause at 16m. 2.5 day Angle marathon. Angle on before R turned on at 1212 with G. No events, steam or huffing from Main, or anything interesting from Mortar before or during the cycle. All vents on at the start of the cycle. Brief jetting from High at 1228 and 1233 but did not stay up for much more than a minute. 1242 FP on and High strengthened and stayed up. 1245 Lock called. 1251 F&M with East Vent first and then Main. |
cb | Time Entered:2021-09-18 13:10:38 Time Uploaded:2021-09-18 13:10:39 Submitted to:GeyserTimes for Android |
CrisG | Time Entered:2021-09-18 13:34:13 Time Uploaded:2021-09-18 13:34:14 Submitted to:GeyserTimes for Android |
Art | Time Entered:2021-09-18 13:44:29 Time Uploaded:2021-09-18 13:44:32 Submitted to:GeyserTimes for iOS |
Ben VL | Time Entered:2021-09-19 09:56:05 Time Uploaded:2021-09-19 09:56:08 Submitted to:GeyserTimes for iOS |